Skip to content
Rear extension and orangery on a period brick house at golden hour, with the traditional rear wall replaced by floor-to-ceiling minimal-frame sliding doors flush with a stone terrace
Extensions, orangeries & renovations

Sliding doors for extensions, orangeries and renovations.

MFP 25, MFP 20, MFP18-H30, Vitrocsa V32 and 3001, and Solarlux Ecoline S systems, specified for extensions and renovation projects: sightlines from 18 mm, flush thresholds, installed by our own team across London and the South East.

01Why specify with us

Four specific reasons, each one provable.

01

Sightlines from 18 mm

MFP18-H30 and Vitrocsa 3001 show just 18 mm of aluminium at the interlock — the slimmest sightline available on any system we install.

02

A system for every scale

From 6 m² panels on MFP18-H30 and Vitrocsa 3001 to 16 m² on MFP 25, with concealed frames, corner and pocket options across the six systems.

03

One team, survey to handover

We survey, specify and install with our own fitters. Flush, Part M-compliant thresholds and full project management as standard.

04

Published figures, nothing added

Every sightline, U-value and panel size on this page is the manufacturer's published specification. No marketing numbers.

02The systems in practice

Details, openings and architectural applications.

Single-storey cedar-clad extension with two floor-to-ceiling black-framed sliding glass doors opening onto a raised timber deck in bright sunlight
Cedar-clad extension, MFP18, opening onto a raised deck.
Interior of a restored room looking out through three-panel black-framed sliding glass doors onto a wooden deck with topiary trees in pots
Restored living room, three panels to the deck, MFP 20/25.
Interior of a minimalist room looking out through floor-to-ceiling minimal-frame sliding glass doors onto a sunny stone-paved garden patio
Gym room to patio, flush threshold throughout, MFP 20/25.
Interior looking out through floor-to-ceiling minimal-frame sliding glass doors with an integrated glass skylight above, toward a stepped garden
Garden room with a skylight above the door head, Vitrocsa.
03Project evidence

Single-storey rear extension. London. Install day.

A pitched-slate rear extension where the full width of the new opening was given to a minimal-frame sliding system. We specified the MFP 20/25 range, surveying the floor build-up before the builders poured so the track could sit flush with the finished floor inside and out.

Our own installation team fitted the run while the extension was still on site, coordinating with the builder on drainage and threshold levels, and handed over with a full demonstration of the sliding action and locking before the garden was landscaped.

MFP 20/25Rear extensionFlush thresholdOur installers
View more completed projects
Single-storey rear extension with a pitched slate roof and wide multi-panel floor-to-ceiling sliding glass doors, viewed from the garden during installation
04Questions answered

Specifications, process, lead times and pricing.

SystemSightlineMax panelGlazingTypical Uw
MFP 2525 mm16 m²Up to 56 mm≥ 0.9 W/m²K
MFP 2020 mm7.5 m²26–30 mm double1.3 W/m²K
MFP18-H3018 mm6 m²28 mm double1.3 W/m²K
Vitrocsa V3223 mm12 m²32 mm doublePer configuration
Vitrocsa 300118 mm6 m²26 mm doublePer configuration
Solarlux Ecoline S55 mm6.75 m²28 mm double1.4 W/m²K
01

Enquiry

Send your details and, if you have them, drawings or photos. We review the opening and come back with an indicative budget.

02

Site survey

We measure the structural opening, floor build-up and drainage, and confirm which systems the dimensions actually allow.

03

Specification & quote

A written specification with the published figures for your system, glazing and configuration, and a fixed quotation.

04

Manufacture

Your system is made to order. Indicatively 10 to 16 weeks from approved drawings, depending on system and glazing; confirmed at quote stage.

05

Installation & handover

Installed by our own fitters, threshold set flush, full demonstration of sliding action and locking at handover.

What does it cost?

Minimal-frame systems for extensions and orangeries sit above standard residential sliding doors. The main drivers are opening size and panel count, double versus triple glazing, and corner, pocket and motorisation options.

Read the cost guide

How long does it take?

Indicatively 10 to 16 weeks from approved drawings to installation, depending on the system and glazing. We confirm the programme for your project at quotation stage.

Read the technical guide
05Enquiry

Tell us about your project.

Send the basics and a line or two about the extension, orangery or renovation. A drawing or photo helps if you have one.

  • We review your details and reply to talk through the system options.
  • You get an indicative budget before anything is measured.
  • A site survey and fixed quotation follow if you want to proceed.

Or call us on 0207 550 6550

Need a full quotation instead? Use the detailed quote form.

Cookies

Strictly necessary cookies keep this site and its quote form working. With your agreement we also use analytics cookies and load the embedded Google Map on our contact page. You can change your mind at any time from the footer, and our Cookie Policy explains each one.